OVRO-LWA Memo Series

Memo Guidelines and Submission Procedure

Number
Title Author(s) Date Status
Links
1
Key Science Projects and Technical Requirements
Gregg Hallinan et al.
TBD
Pending

2
RFI Environment at the OVRO LWA: Quantitative Measurements
Larry D'Addario, Mark Hodges
2019-04-20
Current
Memo 2
3
ADC Crosstalk Measurements with SNAP for OVRO-LWA
Jackson Atwater, Larry D'Addario, Jonathon Kocz
2018-09-18
Current
Memo 3
4
Effective Dynamic Range of Digitizers in the OVRO-LWA Telescope Larry D'Addario 2019-04-27 Current
Memo 4
5
Spectra of OVRO-LWA signals at correlator: predicted vs. observed
Larry D'Addario 2019-04-26
Current
Memo 5
6
ADC Cross-Talk:  Initial Measurements with Test Board
Larry D'Addario 2019-05-11
Current
Memo 6
7
Cable Reflections in Autocorrelation Delay Spectra
Judd Bowman
2019-06-27
Current
Memo 7
8
Filter Designs for Next-Generation Analog Receivers
Larry D'Addario and Nitika Marwaha
2019-08-19
Current
Memo 8
9
Next Generation Analog Receiver Design:  Amplifier Selection
Larry D'Addario 2020-02-02
Current
Memo 9
10
FMC Daughter Board Stacking on SNAP2: Signal Integrity Tests For LWA352 Digitizers
Larry D'Addario 2020-02-09
Current Memo 10
11
Requirement for Maximum Intermodulation-Produced RFI
Larry D'Addario 2020-03-09
Current Memo 11
12
Optical Link Tests
Larry D'Addario 2020-04-04
Current Memo 12
13
Analog Signal Path Analysis for Fiber-Connected Antennas of LWA352
Larry D'Addario 2020-04-07
Current Memo 13
14
Time and Synchronization for OVRO LWA352
Larry D'Addario 2020-05-03
Current Memo 14
15
LWA352 Digitizers: Design Concept
Larry D'Addario 2020-06-15
Current Memo 15
16
Calculation of LWA Antenna Beams and Close Packing Effects
David Woody
2015-10-20
Current
Memo 16




Modified on 2020-06-02 by administrator